Metal and Engineering
Home > Metals and Engineering > Compulsory Units > MEM12024A: Perform computations > Perform computations
Activity 3 Drawing graphs
- Construct a column graph and a bar graph for the data given below for Australian iron ore exports.
| Country |
Value (A$ billion) |
| China |
6 |
| Japan |
3 |
| Republic of Korea |
1 |
| Taiwan |
1 |
| Rest of the world |
1 |
- The table below shows the temperature inside a heat treatment furnace, over an 8-hour period. Construct a line graph to illustrate this information.
| Time (hours) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
| Temperature (0C) |
300 |
500 |
650 |
700 |
800 |
800 |
800 |
650 |
- Complete a scatter graph of the information in the data table below. It gives information about a company’s steel production over eight years.
Draw a line of best fit on the scatter graph so you can make a prediction of their likely steel production in 2008.
| Year |
1999 |
2000 |
2001 |
2002 |
2003 |
2004 |
2005 |
2006 |
Steel Production
(millions tonnes) |
3.6 |
3.9 |
4.3 |
4.7 |
5.0 |
5.5 |
5.9 |
6.4 |
Check your Answers
Back to Activities